North Coast Yard Industrial Shelter – Ohio

North Coast Waterfront Development Corporation

The North Coast Yard is a temporary pop-up park located on the downtown Cleveland lakefront, directly on the shores of Lake Erie. Surrounded by expansive parking lots, shipping activity, and the city skyline, the development sought to create a distinct and inviting space for visitors while ensuring comfort and protection from the elements.

The North Coast Waterfront Development Corporation needed durable, visually striking fabric structures to:

Provide shade and weather protection from wind, sun, and rain.

Create a visible landmark that could stand out in a large, open area.

Be delivered and installed quickly ahead of the park’s opening weekend.

Allshelter supplied large canopy covers designed to handle the challenging waterfront conditions.

The team at North Coast Waterfront Development Corporation appreciated the following key features of the Allshelter product

Rapid Response

Once the order was confirmed, Allshelter coordinated with the project team to ensure delivery to site within 48 hours.

Dedicated Support

Colin and the Allshelter team answered all questions promptly and connected the right stakeholders to keep the process moving smoothly.

The container-mounted shelters were installed ahead of the park’s grand opening weekend. Their bold presence helped define the space and give the temporary park its own identity amidst surrounding parking lots and industrial features.

Reflecting on the impact of Allshelter, a representative from
North Coast Yard Job and North Coast Waterfront Development Corporation shared,
“My experience with Allshelter was great. Colin and his team took care of any questions, got us the answers we needed, and had the structures on site within 48 hours. It was smooth, painless, and something we look forward to doing again.”

Tommy Wightman
Outside Sales Rep at United Rentals Cleveland
“These amazing structures provide protection from the wind, sun, and rain — critical for our visitors here on the Lake Erie shore.
They also give our site presence, helping it stand out and create its own identity in the middle of downtown Cleveland.
We’re very grateful and excited to be open with these structures.”

Zoe Toskos
North Coast Waterfront Development Corporation
Results :

On-Time Delivery: Delivered to site within 48 hours.

• Enhanced Visitor Comfort: Protection from wind, sun, and rain on the Lake Erie waterfront.

• Improved Visual Presence: The structures created a focal point that helps the park stand out against its surroundings.

• Positive Experience: The project was described by the customer as “smooth, painless” and something they “look forward to doing again in the future.”

Let Our Container Shelter Experts Help You

If you have questions, give us a call on +1 888 481 3889.

Get a FREE Quote

Enquire using the form below and your shelter specialist will be in touch.